Phone Mast Removal & Redevelopment: Getting an Operator Off Your Land
A phone mast does not leave when the lease runs out. Ending a Code agreement for redevelopment means serving the right notice, on the right ground, with enough time built in. We manage the whole process for landowners, from notice to reinstatement.
This is our removal and redevelopment service page. For the legal framework behind every clause and notice mentioned here, read our phone mast lease guide. Reviewed by the Phone Mast Advice team.
Why a phone mast lease does not simply end
Under Paragraph 30 of the Electronic Communications Code, a Code agreement continues in force after its contractual term expires until it is brought to an end using the statutory procedure. Waiting for the lease to run out therefore achieves nothing. The operator stays, the rent continues at the old level, and your redevelopment timetable slips.
How do I end a phone mast agreement for redevelopment?
The site provider serves a notice under Paragraph 31 giving at least 18 monthsβ notice and specifying one of four statutory grounds:
- 1Substantial breach of the agreement by the operator
- 2Persistent delays in paying the consideration
- 3An intention to redevelop all or part of the land, or neighbouring land, which cannot reasonably be carried out unless the agreement ends
- 4The public benefit test in Paragraph 21 is no longer met
If the operator serves a counter-notice within three months, the agreement continues until the Tribunal determines the matter. Since 7 April 2026, Code disputes are heard by the First-tier Tribunal (Property Chamber), and since November 2023 both parties are required to consider alternative dispute resolution before applying. A defective notice, or the wrong ground, can void the whole process, as the Court of Appeal made clear in On Tower UK Ltd v BT plc [2025] EWCA Civ 844.
Where the agreement is still protected by the Landlord and Tenant Act 1954 rather than the Code, the equivalent route is to oppose renewal on the redevelopment ground in section 30(1)(f), which has its own notice rules and may carry statutory compensation. We identify which regime applies before any notice is served.
What do I need to prove for the redevelopment ground?
The Tribunal looks for a firm, settled, and unconditional intention to redevelop, and a reasonable prospect of carrying it out. Evidence that carries weight includes planning permission or a credible application, funding, professional appointments, board or trustee resolutions, and a programme showing why the mast must go. The test was confirmed in EE Ltd v Sir James Chichester [2019] UKUT 164 (LC) and applied in CTIL v Firoka (Kings Cross) Ltd (2025), where a hotel owner succeeded against a rooftop application on genuine redevelopment grounds.
The same ground appears in Paragraph 21(5) as a defence when an operator applies for a new agreement, so landowners with building plans should raise it at the earliest opportunity.
Removal and reinstatement: who pays?
The operator. Under Paragraph 40, once the agreement has ended the site provider can require removal of the apparatus and restoration of the land. A well-drafted lease spells out what that means: foundations, cabinets, fencing, cables, access tracks, and any equipment installed by a sharing operator. We check your reinstatement clause early, because a weak one can leave you with the bill.
Rooftop works: lift and shift instead of termination
Re-roofing, cladding replacement, and Building Safety Act works rarely require the mast to go permanently. A lift and shift clause obliges the operator to relocate or remove its equipment for the duration of the works, at its own cost and on reasonable notice. If your lease has no such clause, we negotiate one as part of a renewal or rent review, or advise on the Paragraph 31 route where the works genuinely amount to redevelopment.
How our removal and redevelopment service works
1. Regime and timetable
We establish whether your agreement sits under the Code or the 1954 Act, what notice periods apply, and how they fit your development programme.
2. Building the case
We assemble the redevelopment evidence and draft the notice so that every statutory requirement is met the first time.
3. Negotiation and ADR
Most matters settle. We negotiate a consensual exit or relocation with the operator, using ADR where it shortens the timetable.
4. Tribunal and reinstatement
Where the operator resists, we support your legal team through the Tribunal and then manage removal and reinstatement of the site.
Our fees
The initial consultation is free and without obligation. Fees for removal and redevelopment work depend on the route required and are agreed with you in writing before we start. We act exclusively for landowners.
Removal and redevelopment: frequently asked questions
You may also need
Free Lease Check
Find out which regime applies
Phone Mast Lease Guide
Paragraphs 21, 30, 31, and 40 explained
Lease Renewals
If you decide to keep the mast
New Lettings
Protecting plans from day one
Mast Sales
Selling the income instead
Contact Our Team
Speak to a specialist today
This page was last updated on 3 September 2026. It is general guidance for landowners and does not constitute legal advice. Notices under the Code carry strict requirements; please contact us before serving one.
Planning to Redevelop a Site With a Phone Mast?
The notice period alone is 18 months. The earlier we start, the more control you keep over your timetable. Free initial consultation.